Wood Waste Estate Planner
Map your whole estate — every site and every extraction filter — and see the wood waste, suggested silo, boiler and optional ORC for each one on a single screen. Suggestions follow your entered tonnages; use the arrows to step any selection up or down a size.
Whole estate at a glance
Silo suggestions use an estimated storage rule (3 days at 0.3 t/m³, matching the silo-sizing tool) pending confirmation. Boiler suggestions target the estate utilisation band and are sized on the burn rate needed to clear each week's tonnage inside the running hours (blank = continuous, 168 h/wk; a site may override the estate figure). ORC figures are indicative steady-state utilisation while the plant runs, shown for every ORC you add, with ORC hours scaled to the running week. Savings combine avoided disposal, site gas offset (capped at each site's entered annual gas), and ORC electricity at the set price — estimates for discussion, not a quotation. Final selection always depends on site survey.